Our Wind Farms

In the wind energy sector, which is our core business, we have realized more than 200 wind turbines with a total output of over 450 MW. Further projects are in the planning and implementation stages.

Wind Farms Under Construction

Diepholzer Bruch wind farm

Diepholzer Bruch wind farm

2024 A total of 9 wind turbines of the type 8x Enercon-160 EP5 E3 with a hub height of 166.0 m and an output of ...
Kuppendorf wind farm

Kuppendorf wind farm

2024 We erect 1 prototype of an Enercon-175 EP5 wind turbine with a hub height of 160 m and an output of 6 MW in ...
Wörderfeld wind farm

Wörderfeld wind farm

2024 We will erect 2 Enercon-160 EP5 E3 wind turbines with a hub height of 160 m and an output of 5.56 MW each in ...
Wind Farm Luedge

Wind Farm Luedge

In 2021, a total of 7 wind turbines of the type GE-5.3-158 with a hub height of 161.0 m and a capacity of 5.3 MW ...

Wind Farms in Operation

Wind Farm Albringhausen II

Wind Farm Albringhausen II

In 2022, a total of 10 Enercon 160 EP5 E3 wind turbines with a hub height of 166.0 m and a capacity of 5.56 MW ...
Wind farm Bruchhagen-Nendorf

Wind farm Bruchhagen-Nendorf

(06.05.2021) Wind farm Bruchhagen-Nendorf     A total of 14 Enercon E-126 EP3 wind ...
Wind Farm Albringhausen

Wind Farm Albringhausen

In 2021, a total of 7 wind turbines of the type GE-5.3-158 with a hub height of 161.0 m and a capacity of 5.3 MW ...
Wind farm Rüssen-Nord (E-82)

Wind farm Rüssen-Nord (E-82)

In 2017, 1 wind turbine of the type Enercon E-82 with a total output of 2.3 MW was erected at the Rüssen-Nord II ...
Wind farm Hoyerhagen

Wind farm Hoyerhagen

In 2017, 9 wind turbines of the type Enercon E-115 with a total output of 27.0 MW were erected at the Hoyerhagen ...
Wind farm Borwede

Wind farm Borwede

2017 wurden im Windpark Twistringen / Borwede 7 Windenergieanlagen des Typs Enercon E-115 mit einer Gesamtleistung ...
Wind farm Eyershausen

Wind farm Eyershausen

In 2017, 1 wind turbine of the type Enercon E-115 with a total output of 3.0 MW was erected at the Eyershausen wind farm.
Wind farm Barver II

Wind farm Barver II

In 2017, 1 wind turbine of the type Enercon E-115 with a total output of 3.0 MW was erected at the Eyershausen wind farm.
WindparkWEA-NrBaujahrAnlagentypLeistung in MWNabenhöhe in mKreisGemeindeGemarkungGesellschaftIBNkWpNameAnz. angeschlossene WEAGes. Nennleistung WEA (MW)