Wind farm Albringhausen
(29.04.2021) Wind farm Albringhausen A total of 7 GE-5.3-158 wind turbines, with a hub height of 161.0 m and a capacity of 5.3 MW have been erected and put into operation, Albringhausen is located in the district of Bassum. Current work in the wind farm: During the...
Wind farm Bruchhagen-Nendorf
(06.05.2021) Wind farm Bruchhagen-Nendorf A total of 14 Enercon E-126 EP3 wind turbines with a hub height of 134.35m and a capacity of 4.0 MW each have been erected in Bruchhagen-Nendorf, Flecken Steyerberg, district of Nienburg. Current work at the wind...
Sustainable hydrogen hub planned in Steyerberg
(09.06.2021) Sustainable hydrogen hub planned in Steyerberg Press article | DIE HARKE from 09.06.2021 Several project partners met in Nienburg, Lower Saxony and have consolidated their efforts and are planning to build a sustainable hydrogen hub called „H2art of...
Hydrogen Region LK Diepholz
(20.09.2019) Hydrogen Region LK Diepholz Technically feasible: Storing surplus wind energy More than 25 participants accepted an invitation from the district of Diepholz to the kick-off event “Hydrogen Region District of Diepholz” at the Mechatronics and...




Recent Comments