Tender Awarded for Albringhausen II

Tender Awarded for Albringhausen II

(16.12.2021) Tender Awarded for Albringhausen II On 1 September 2021, WestWind ENERGY won the onshore feed-in tendering bid for its repowering project Albringhausen II. The allocation covers 10 ENERCON E-160 EP5 wind turbines with a rated output of 5.5 MW each at a...
Wind farm Albringhausen

Wind farm Albringhausen

(29.04.2021) Wind farm Albringhausen   A total of 7  GE-5.3-158 wind turbines, with a hub height of 161.0 m and a capacity of 5.3 MW have been erected and put into operation, Albringhausen is located in the district of Bassum. Current work in the wind farm: During the...
Sustainable hydrogen hub planned in Steyerberg

Sustainable hydrogen hub planned in Steyerberg

(09.06.2021) Sustainable hydrogen hub planned in Steyerberg   Press article | DIE HARKE from 09.06.2021 Several project partners met in Nienburg, Lower Saxony and have consolidated their efforts and are planning to build a sustainable hydrogen hub called „H2art of...
Hydrogen Region LK Diepholz

Hydrogen Region LK Diepholz

(20.09.2019) Hydrogen Region LK Diepholz   Technically feasible: Storing surplus wind energy More than 25 participants accepted an invitation from the district of Diepholz to the kick-off event “Hydrogen Region District of Diepholz” at the Mechatronics and...