by WWind2020Admin | Nov 18, 2021 | 2020, 2021, News
(29.04.2021) Wind farm Albringhausen A total of 7 GE-5.3-158 wind turbines, with a hub height of 161.0 m and a capacity of 5.3 MW have been erected and put into operation, Albringhausen is located in the district of Bassum. Current work in the wind farm: During the... by WWind2020Admin | Nov 18, 2021 | 2021, News, Wind farm in operation
(06.05.2021) Wind farm Bruchhagen-Nendorf A total of 14 Enercon E-126 EP3 wind turbines with a hub height of 134.35m and a capacity of 4.0 MW each have been erected in Bruchhagen-Nendorf, Flecken Steyerberg, district of Nienburg. Current work at the wind... by WWind2020Admin | Nov 16, 2021 | Wind farm in operation, wind farms
Wind farm Albringhausen Wind farm AlbringhausenIn 2021, a total of 7 GE-5.3-158 wind turbines with a hub height of 161.0 m and a capacity of 5.3 MW each were built and put into commission in Albringhausen, Bassum ctiy, district of Lower Saxony. Commissioning:... by WWind2020Admin | Nov 16, 2021 | Wind farm in operation
Wind farm Bruchhagen-Nendorf Wind farm Bruchhagen-NendorfIn 2021, a total of 14 Enercon E-126 EP3 wind turbines with a hub height of 134.35 m and a capacity of 4.0 MW each, were built and put into commission in Bruchhagen, Flecken Steyerberg, Stolzenau, district of... by WWind2020Admin | Nov 16, 2021 | Wind farm in operation, wind farms, WindparkHome
Wind farm Rüssen-Nord (E-82) Wind farm Rüssen-Nord (E-82)In 2017, 1 wind turbine of the type Enercon E-82 with a total output of 2.3 MW was erected at the Rüssen-Nord II wind farm. Commissioning: 2017Manufacturer: Enercon GmbH, AurichQuantity: 1 x Enercon E-82Rated...
Recent Comments