Wind farm Hustedt

Wind farm Hustedt

Wind farm Hustedt Wind farm HustedtWe are constructing one Enercon-175 EP5 wind turbine with a hub height of 139 m and an output of 6 MW in Hustedt, Bruchhausen-Vilsen municipality, Martfeld district.Commissioning:Manufacturer: Enercon GmbHNumber: 1 x Enercon-175...
Windpark Harsewinkel-Kattenstrot

Windpark Harsewinkel-Kattenstrot

Wind Farm Harsewinkel-Kattenstrot Wind Farm Harsewinkel-KattenstrotWe are constructing two Enercon-160 EP5 E3 wind turbines with a hub height of 166 m and an output of 5.56 MW in the Kattenstrot district of Harsewinkel, in the district of...
Wind farm Albringhausen

Wind farm Albringhausen

(29.04.2021) Wind farm Albringhausen   A total of 7  GE-5.3-158 wind turbines, with a hub height of 161.0 m and a capacity of 5.3 MW have been erected and put into operation, Albringhausen is located in the district of Bassum. Current work in the wind farm: During the...