by A Z | Jan 21, 2025 | 2024, 2025, News
(06.01.2025) Jubilee WestWind Energy distributes “birthday money” Jubilarian Westwind Energy distributes Sylvia Wendt’s “birthday money” – Miedengruppe Kreiszeitung Kirchdorf, Gerard Meindertsma, his wife Hannelore, daughter Michaela and Jörg Osterholz...
by A Z | Jan 3, 2025 | 2024, 2024, News, News, wind farm under construction, wind farm under construction
Schobrink Wind Farm Schobrink Wind FarmWe are erecting 2 Enercon-138 EP3 E3 wind turbines with a hub height of 162 m and an output of 4.25 MW in Schobrink, Diepholz county. Commissioning: Summer 2025Manufacturer: Enercon GmbHQuantity: 2 x Enercon-138 EP3 E3Nominal...
by A Z | Oct 10, 2024 | 2024, News, wind farm under construction
Diepholzer Bruch Wind Farm Diepholzer Bruch wind farmA total of 9 wind turbines, including 8x Enercon-160 EP5 E3 with a hub height of 166.0 m and an output of 5.56 MW each and one Enercon E-138 EP3 E3 with a hub height of 130 m and an output of 4.26 MW will be built...
by WWind2020Admin | Aug 30, 2024 | 2024, News
(30.08.2024) WestWind ENERGY celebrates a magical and unforgettable 25th anniversary WestWind ENERGY has achieved a lot in the wind industry since 1998 and this was celebrated on 16.08.2024 at a wonderful party at Gasthaus Störmer in Ströhen with employees,...
by A Z | Mar 14, 2022 | 2022, News, Wind farm in operation, wind farms, wind farm under construction
Wind Farm Albringhausen II Wind Farm Albringhausen IIIn 2022 a total of 10 Enercon 160 EP5 E3 wind turbines with a hub height of 166 m and a capacity of 5.56 MW each, will be erected in Albringhausen, District of Bassum. Commissioning: 2023 Manufacturer: Enercon PLM...
by A Z | Dec 16, 2021 | 2021, News
(16.12.2021) Spectacular Rotor Blade Transport At our Bruchhagen-Nendorf wind farm, a 61 m long rotor blade belonging to a ENERCON E126 EP3 had to be replaced recently. Using a Bladelifter, the STEIL company transported the new 19 t rotor blade from the reloading...
Recent Comments