Wind Farm Albringhausen II

Wind Farm Albringhausen II

Wind Farm Albringhausen II Wind Farm Albringhausen IIIn 2022 a total of 10 Enercon 160 EP5 E3 wind turbines with a hub height of 166 m and a capacity of 5.56 MW each, will be erected in Albringhausen, District of Bassum. Commissioning: 2023 Manufacturer: Enercon PLM...
Spectacular Rotor Blade Transport

Spectacular Rotor Blade Transport

(16.12.2021) Spectacular Rotor Blade Transport At our Bruchhagen-Nendorf wind farm, a 61 m long rotor blade belonging to a ENERCON E126 EP3 had to be replaced recently. Using a Bladelifter, the STEIL company transported the new 19 t rotor blade from the reloading...
Tender Awarded for Wind Farm Senden

Tender Awarded for Wind Farm Senden

(16.12.2021) Tender Awarded for Wind Farm Senden On 1 September 2021, WestWind ENERGY won the onshore feed-in tendering bid for its wind farm in Senden. The allocation covers 2 GE 5.3-158 wind turbines with a rated output of 5.3 MW each at a price of 5.65 ct/kWh. A...
Tender Awarded for Wind Farm Senden

Tender Awarded for Albringhausen II

(16.12.2021) Tender Awarded for Albringhausen II On 1 September 2021, WestWind ENERGY won the onshore feed-in tendering bid for its repowering project Albringhausen II. The allocation covers 10 ENERCON E-160 EP5 wind turbines with a rated output of 5.5 MW each at a...