by A Z | Sep 8, 2023 | 2023, 2023, 2023, News, News, Wind farm in operation, Wind farm in operation
Wind Farm Senden Windpark Senden-Bösensell2 Enercon-160 EP5 E3 wind turbines, with a hub height of 160,0 and a capacity of 5,56 MW each, will be erected in Bösensell district of Senden. Commissioning: 2024Manufacturer: Enercon GmbHTurbines: 2 x Enercon-160 EP5...
by A Z | Mar 14, 2022 | 2022, News, Wind farm in operation, wind farms, wind farm under construction
Wind Farm Albringhausen II Wind Farm Albringhausen IIIn 2022 a total of 10 Enercon 160 EP5 E3 wind turbines with a hub height of 166 m and a capacity of 5.56 MW each, will be erected in Albringhausen, District of Bassum. Commissioning: 2023 Manufacturer: Enercon PLM...
by A Z | Dec 16, 2021 | 2021, News
(16.12.2021) Spectacular Rotor Blade Transport At our Bruchhagen-Nendorf wind farm, a 61 m long rotor blade belonging to a ENERCON E126 EP3 had to be replaced recently. Using a Bladelifter, the STEIL company transported the new 19 t rotor blade from the reloading...
by A Z | Dec 16, 2021 | 2021, News
(16.12.2021) Tender Awarded for Wind Farm Senden On 1 September 2021, WestWind ENERGY won the onshore feed-in tendering bid for its wind farm in Senden. The allocation covers 2 GE 5.3-158 wind turbines with a rated output of 5.3 MW each at a price of 5.65 ct/kWh. A...
by A Z | Dec 16, 2021 | 2021, News
(16.12.2021) Tender Awarded for Albringhausen II On 1 September 2021, WestWind ENERGY won the onshore feed-in tendering bid for its repowering project Albringhausen II. The allocation covers 10 ENERCON E-160 EP5 wind turbines with a rated output of 5.5 MW each at a...
Recent Comments