by WWind2020Admin | Aug 26, 2021 | Substation, Substation in operation
SubstationNeuenkirchen Umspannwerk Neuenkirchen7 wind turbines with a total capacity of 37.1 MW are connected to the Neuenkirchen substation. Commissioning: 13.08.20Number of connected WPPs: 7Total rated power WPP (MW):... by WWind2020Admin | Aug 26, 2021 | Substation, Substation in operation
Substation Hoysinghausen Substation Hoysinghausen14 wind turbines with a total capacity of 56 MW are connected to the Hoysinghausen substation. Commissioning: 7.1.2021Number of connected WPP: 14Total rated power WPP (MW):...
Recent Comments