Substation Hoysinghausen Substation Hoysinghausen14 wind turbines with a total capacity of 56 MW are connected to the Hoysinghausen substation.Commissioning: 7.1.2021Number of connected WPP: 14Total rated power WPP (MW): 56 Substation Neuenkirchen →