Substation Kuppendorf
Substation Kuppendorf Substation Kuppendorf28 wind turbines with a total output of 56.6 MW are connected to the Kuppendorf substation. Commissioning: 02.12.2004Number of connected WPPs: 28Total rated power WPP (MW):...
Substation Siedenburg
Substation Siedenburg Substation Siedenburg30 wind turbines with a total output of 62.4 MW are connected to the Siedenburg substation. Commissioning: 21.12.2005Number of connected WPPs: 30Total rated power WPP (MW):...
Substation Neuenkirchen
SubstationNeuenkirchen Umspannwerk Neuenkirchen7 wind turbines with a total capacity of 37.1 MW are connected to the Neuenkirchen substation. Commissioning: 13.08.20Number of connected WPPs: 7Total rated power WPP (MW):...