Wind farm Borstel II
Wind farm Borstel II Wind farm Borstel IIIn 2013, a REpower MM-92 wind turbine with a total output of 2.05 MW was erected at the Borstel II wind farm. Commissioning: 2013Manufacturer: Senvion SE, HamburgQuantity: 1 x REpower MM-92Rated power: 2.05 MWHub height: 100...
Wind farm Mensinghausen III
Wind farm Mensinghausen III Wind farm Mensinghausen IIIIn 2013, 2 wind turbines of the type Enercon E-82 with a total output of 2.6 MW were erected at the Meninghausen III wind farm. Commissioning: 2013Manufacturer: Enercon GmbH , AurichQuantity: 2x Enercon...
Wind farm Borstel
Wind farm Borstel Wind farm BorstelIn 2009, 1 wind turbine of the type REpower MM-92 with a total output of 2.05 MW was erected at the Borstel wind farm. Commissioning: 2009Manufacturer: Enercon GmbH, AurichQuantity: 1x Enercon E-82Rated power: 2 MWHub height: 108...
Wind farm Wetscher Bruch
Wind farm Wetscher Bruch Wind farm Wetscher BruchIn 2012, 6 wind turbines of the type Enercon E-101 with a total output of 18.0 MW were erected at the Wetscher Bruch wind farm. Commissioning: 2012Manufacturer: Enercon GmbH, AurichNumber: 6x Enercon E-101Nominal...




Recent Comments