Wind farm Bielefeld-Brönninghausen

 

Wind farm Bielefeld-Brönninghausen

In 2014, 1 wind turbine of the type Enercon E-82 with a total output of 2.3 MW was erected at the Brönninghausen wind farm.

Commissioning: 2014
Manufacturer: Enercon GmbH , Aurich
Quantity: 1 x Enercon E-82-E2
Nominal power: 2.3 MW
Hub height: 108.38 m
Rotor Ø: 82 m