{"id":14511,"date":"2022-03-14T10:25:00","date_gmt":"2022-03-14T09:25:00","guid":{"rendered":"https:\/\/www.w-wind.de\/?p=14511"},"modified":"2023-09-08T09:21:55","modified_gmt":"2023-09-08T07:21:55","slug":"wind-farm-albringhausen-ii","status":"publish","type":"post","link":"https:\/\/www.w-wind.de\/en\/wind-farm-albringhausen-ii","title":{"rendered":"Wind Farm Albringhausen II"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; admin_label=&#8221;Header Section&#8221; _builder_version=&#8221;4.16&#8243; background_color=&#8221;#ffffff&#8221; background_position=&#8221;top_center&#8221; custom_padding=&#8221;0%|0px|0px|0px||&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_row custom_padding_last_edited=&#8221;off|desktop&#8221; admin_label=&#8221;Header Row&#8221; _builder_version=&#8221;4.16&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; custom_margin=&#8221;|||&#8221; custom_padding=&#8221;|||&#8221; custom_padding_phone=&#8221;3vw|||&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_divider color=&#8221;#afca0b&#8221; divider_weight=&#8221;3px&#8221; disabled_on=&#8221;on|on|off&#8221; _builder_version=&#8221;4.16&#8243; max_width=&#8221;80px&#8221; module_alignment=&#8221;center&#8221; height=&#8221;10px&#8221; custom_margin=&#8221;||20px|&#8221; animation_style=&#8221;slide&#8221; animation_direction=&#8221;bottom&#8221; saved_tabs=&#8221;all&#8221; locked=&#8221;off&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_divider][et_pb_text admin_label=&#8221;Heading &#038; Subheading&#8221; _builder_version=&#8221;4.16&#8243; text_font=&#8221;Muli|600|||||||&#8221; text_font_size=&#8221;18px&#8221; text_line_height=&#8221;1.8em&#8221; header_font=&#8221;titilliumweb-light||||||||&#8221; header_font_size=&#8221;65px&#8221; header_line_height=&#8221;1.4em&#8221; header_2_font=&#8221;||||||||&#8221; text_orientation=&#8221;center&#8221; max_width=&#8221;800px&#8221; max_width_last_edited=&#8221;off|desktop&#8221; module_alignment=&#8221;center&#8221; custom_margin=&#8221;|||&#8221; custom_padding=&#8221;|||&#8221; custom_padding_last_edited=&#8221;off|desktop&#8221; animation_style=&#8221;fade&#8221; header_font_size_tablet=&#8221;&#8221; header_font_size_phone=&#8221;50px&#8221; header_font_size_last_edited=&#8221;on|desktop&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h1>Wind Farm Albringhausen II<\/h1>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row column_structure=&#8221;1_2,1_2&#8243; use_custom_gutter=&#8221;on&#8221; gutter_width=&#8221;1&#8243; make_equal=&#8221;on&#8221; admin_label=&#8221;Case Study Row&#8221; _builder_version=&#8221;4.17.4&#8243; box_shadow_style=&#8221;preset1&#8243; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;1_2&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_image src=&#8221;https:\/\/www.w-wind.de\/wp-content\/uploads\/2023\/05\/AlbR_WEA_01_62a.jpg&#8221; force_fullwidth=&#8221;on&#8221; align_tablet=&#8221;center&#8221; align_phone=&#8221;&#8221; align_last_edited=&#8221;on|desktop&#8221; _builder_version=&#8221;4.20.4&#8243; custom_margin=&#8221;|||5%|false|false&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_image][\/et_pb_column][et_pb_column type=&#8221;1_2&#8243; _builder_version=&#8221;4.16&#8243; background_color=&#8221;#ffffff&#8221; custom_padding=&#8221;60px|60px|60px|60px&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_cta title=&#8221;Wind Farm Albringhausen II&#8221; button_url=&#8221;#top&#8221; admin_label=&#8221;Title Paragraph &#038; CTA Button&#8221; _builder_version=&#8221;4.16&#8243; header_level=&#8221;h3&#8243; header_font=&#8221;titilliumweb-light|700|||||||&#8221; header_font_size=&#8221;26px&#8221; header_line_height=&#8221;1.4em&#8221; body_font=&#8221;frutiger55roman||||||||&#8221; body_font_size=&#8221;16px&#8221; body_line_height=&#8221;1.8em&#8221; use_background_color=&#8221;off&#8221; text_orientation=&#8221;left&#8221; background_layout=&#8221;light&#8221; custom_padding=&#8221;|||&#8221; button_border_radius_hover=&#8221;0px&#8221; global_colors_info=&#8221;{}&#8221; button_text_size__hover_enabled=&#8221;off&#8221; button_one_text_size__hover_enabled=&#8221;off&#8221; button_two_text_size__hover_enabled=&#8221;off&#8221; button_text_color__hover_enabled=&#8221;off&#8221; button_one_text_color__hover_enabled=&#8221;off&#8221; button_two_text_color__hover_enabled=&#8221;off&#8221; button_border_width__hover_enabled=&#8221;off&#8221; button_one_border_width__hover_enabled=&#8221;off&#8221; button_two_border_width__hover_enabled=&#8221;off&#8221; button_border_color__hover_enabled=&#8221;off&#8221; button_one_border_color__hover_enabled=&#8221;off&#8221; button_two_border_color__hover_enabled=&#8221;off&#8221; button_border_radius__hover_enabled=&#8221;on&#8221; button_border_radius__hover=&#8221;0px&#8221; button_one_border_radius__hover_enabled=&#8221;off&#8221; button_two_border_radius__hover_enabled=&#8221;off&#8221; button_letter_spacing__hover_enabled=&#8221;off&#8221; button_one_letter_spacing__hover_enabled=&#8221;off&#8221; button_two_letter_spacing__hover_enabled=&#8221;off&#8221; button_bg_color__hover_enabled=&#8221;off&#8221; button_one_bg_color__hover_enabled=&#8221;off&#8221; button_two_bg_color__hover_enabled=&#8221;off&#8221;]<\/p>\n<p>In 2022 a total of 10 Enercon 160 EP5 E3 wind turbines with a hub height of 166 m and a capacity of 5.56 MW each, will be erected in Albringhausen, District of Bassum.<\/p>\n<p><strong>Commissioning: 2023<\/strong><br \/> <strong>Manufacturer:<\/strong> Enercon PLM GmbH<br \/> <strong>Turbines:<\/strong> 10x Enercon 160 EP5 E3<br \/> <strong>Output:<\/strong> 5.56 MW<br \/> <strong>Hub Height:<\/strong> 166 m<br \/> <strong>Rotor<\/strong> \u00d8: 160 m<\/p>\n<p>[\/et_pb_cta][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=&#8221;4.16&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.16&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_gallery gallery_ids=&#8221;16381,16365,16367,16361,16341,16339,16337,16265,16238,16223,16221,16219,16217,16215,16213,16199,16197,16194,16180,16178,16176,16161,16157,16155,16153,16148,16126,16124,16122,15762,15760,15756,15686,15598,15581,15540,15547&#8243; posts_number=&#8221;12&#8243; dbdb_version=&#8221;4.2.9&#8243; show_title_and_caption=&#8221;off&#8221; zoom_icon_color=&#8221;#afca0b&#8221; disabled_on=&#8221;off|off|off&#8221; _builder_version=&#8221;4.20.4&#8243; _module_preset=&#8221;default&#8221; custom_margin=&#8221;||-32px|||&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_gallery][\/et_pb_column][\/et_pb_row][\/et_pb_section][et_pb_section fb_built=&#8221;1&#8243; admin_label=&#8221;Introduction&#8221; _builder_version=&#8221;4.16&#8243; width=&#8221;80%&#8221; module_alignment=&#8221;center&#8221; custom_margin=&#8221;|||&#8221; custom_padding=&#8221;30px|0px|31px|0px|false|false&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_row column_structure=&#8221;1_2,1_2&#8243; use_custom_gutter=&#8221;on&#8221; gutter_width=&#8221;2&#8243; _builder_version=&#8221;4.16&#8243; width=&#8221;100%&#8221; max_width=&#8221;1200px&#8221; animation_style=&#8221;fade&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;1_2&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text _builder_version=&#8221;4.22.0&#8243; text_font=&#8221;frutiger55roman||||||||&#8221; text_font_size=&#8221;16px&#8221; text_line_height=&#8221;2em&#8221; header_font=&#8221;titilliumweb-light||||||||&#8221; max_width=&#8221;550px&#8221; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<p>A total of 10 Enercon 160 EP5 E3 wind turbines with a hub height of 166 m and a capacity of 5.56 MW each will be erected in Albringhausen, District of Bassum.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Current Operations:<\/strong><\/p>\n<p>Weather permitting, the Koldewei company will soon start removing excess curve radii and excess crane staging areas. This will then also include the remediation of the crane parking areas and gravel access roads.<\/p>\n<p>The Koldewei company has started the installation of a tower drainage system, which includes a connection to the existing field drainage system.<\/p>\n<p>Wind turbines 1, 2, 3, 4, 5, 6, 7, 8, 9 and 10 have been completed.<\/p>\n<p>WTGs 2, 3, 4, 5, 6, 7, 8, 9 and 10 have been completed, commisioned and are now in service.<\/p>\n<p>Simultaneously, the DUS Kabelmontage company is laying the cables to and from the substation.<\/p>\n<p><strong>Completed Operations at the Wind Park:<\/strong><\/p>\n<p>The DUS Kabelmontage company has finished laying the cables to and from the substation and wind turbines.<\/p>\n<p>The concrete tower assembly phase has been completed.<\/p>\n<p>The Max-B\u00f6gl company has completed the construction of the foundations.<\/p>\n<p>The pruning of trees and shrubs was carried out in January and February 2022 by the GaLaBau-Nietfeld company from Staken\/Steyerberg. Many thanks to the Nietfeld company for their solid partnership and the impeccable execution of their work.<\/p>\n<p>The dismantling of the 13 old Enron 1.5 wind turbines was completed during the 15th calendar week.<\/p>\n<p>The demoliton of the 13 old Enron 1,5 Wind turbine foundations was complete on 14 April 2022. We would like to thank the Reisch Sprengtechnik GmbH company for their professionalism and impeccable work.<\/p>\n<p>During week 13, the Koldwei company started with roadworks and the construction of crane parking areas. All road works were completed in May.<\/p>\n<p><strong>Foundation Builders: <\/strong>Max- B\u00f6gl 92369 Sengenthal<br \/><strong>Tower Assembly:<\/strong> Max- B\u00f6gl 92369 Sengenthal<br \/><strong>Tower Assembly:<\/strong> Wasel GmbH 50126 Bergheim<br \/><strong>Tower Assembly:<\/strong> H\u00fcffermann Krandienst 21683 Stade<br \/><strong>Roadworks: <\/strong>W. Koldewei GmbH\u00a0 27252 Schwaf\u00f6rden<br \/><strong>Demolition<\/strong> <strong>&amp; Recycling<\/strong>: Wiechert GmbH\u00a0 49453 Hemsloh<br \/><strong>Blasting Operations: <\/strong>Reisch Sprengtechnik GmbH\u00a0 86974 Apfeldorf<\/p>\n<p>&nbsp;<\/p>\n<p><strong>WEA 1<\/strong><br \/>1.\u00a0\u00a0 KW 43 &gt; Concrete tower assembly has been completed.<br \/>2.\u00a0\u00a0 KW 50 &gt; Delivery of blades, generator and nacelle.<br \/>3.\u00a0\u00a0 KW 11 &gt; Delivery &amp; assembly of LR 11000 Hueffermann crane.<br \/>4.\u00a0\u00a0 KW 16 &gt; Final assembly in progress.<br \/>5.\u00a0\u00a0 KW 17 &gt; Wind turbine assembly completed.<br \/>6.\u00a0\u00a0 KW 19 &gt; WTG is online &amp; in operation.<\/p>\n<p><strong>WEA 2<\/strong><br \/>1.\u00a0\u00a0 KW 39 &gt; Tower assembly has commenced.<br \/>2.\u00a0\u00a0 KW 41 &gt; Concrete tower assembly has been completed.<br \/>3.\u00a0\u00a0 KW 48 &gt; Delivery of blades, generator and nacelle.<br \/>4. \u00a0 KW 08 &gt; Final assembly in progress.<br \/>5.\u00a0\u00a0 KW 09 &gt; Wind turbine assembly completed.<br \/>6.\u00a0\u00a0 KW 16 &gt; WTG is online &amp; in operation.<\/p>\n<p><strong>WEA 3<\/strong><br \/>1.\u00a0\u00a0 KW 40 &gt; Tower assembly has commenced.<br \/>2.\u00a0\u00a0 KW 42 &gt; Concrete tower assembly has been completed.<br \/>3.\u00a0\u00a0 KW 45 &gt; Delivery of blades, generator and nacelle.<br \/>4.\u00a0\u00a0 KW 08 &gt; Final assembly in progress.<br \/>5. \u00a0 KW 09 &gt; Wind turbine assembly completed.<br \/>6.\u00a0\u00a0 KW 17 &gt; WTG is online &amp; in operation.<\/p>\n<p><strong>WEA 4<\/strong><br \/>1.\u00a0\u00a0 KW 35 &gt; Concrete tower assembly has been completed.<br \/>2.\u00a0\u00a0 KW 40 &gt; Delivery of blades, generator and nacelle.<br \/>3.\u00a0\u00a0 KW 43 &gt; Delivery &amp; assembly of LR 11000 Hueffermann crane.<br \/>4.\u00a0\u00a0 KW 46 &gt; Tower, nacelle and rotor blade assembly in progress.<br \/>5.\u00a0\u00a0 KW 50 &gt; Wind turbine assembly completed.<br \/>6.\u00a0\u00a0 KW 08 &gt; WTG is online &amp; in operation.<\/p>\n<p><strong>WEA 5<\/strong><br \/>1.\u00a0\u00a0 KW 35 &gt; Concrete tower assembly has been completed.<br \/>2.\u00a0\u00a0 KW 36 &gt; Delivery &amp; assembly of LR 11000 Wasel crane.<br \/>3.\u00a0\u00a0 KW 40 &gt; Delivery of blades, generator and nacelle.<br \/>4.\u00a0\u00a0 KW 43 &gt; Tower, nacelle and rotor blade assembly in progress.<br \/>5.\u00a0\u00a0 KW 48 &gt; Wind turbine assembly completed.<br \/>6.\u00a0\u00a0 KW 07 &gt; WTG is online &amp; in operation.<\/p>\n<p><strong>WEA 6<\/strong><br \/>1.\u00a0\u00a0 KW 33 &gt; Concrete tower assembly has been completed.<br \/>2.\u00a0\u00a0 KW 38 &gt; Delivery of blades, generator and nacelle.<br \/>3.\u00a0\u00a0 KW 38 &gt; Delivery &amp; assembly of LR 11000 Hueffermann crane.<br \/>4. \u00a0 KW 42 &gt; Wind turbine assembly completed.<br \/>5. \u00a0 KW 42 &gt; Crane will be disassembled and moved to WEA 4.<br \/>6.\u00a0\u00a0 KW 03 &gt; WTG is online &amp; in operation.<\/p>\n<p><strong>WEA 7<\/strong><br \/>1.\u00a0\u00a0 KW 36 &gt; Tower assembly has commenced.<br \/>2.\u00a0\u00a0 KW 38 &gt; Concrete tower assembly has been completed.<br \/>3.\u00a0\u00a0 KW 44 &gt; Delivery of blades, generator and nacelle.<br \/>4. \u00a0 KW 44 &gt; Relocation &amp; assembly of LR 11000 Wasel crane.<br \/>5. \u00a0 KW 05 &gt; Wind turbine assembly completed.<br \/>6. \u00a0 KW 12 &gt; WTG is online &amp; in operation.<\/p>\n<p><strong>WEA 8<\/strong><br \/>1.\u00a0\u00a0 KW 35 &gt; Tower assembly has commenced.<br \/>2.\u00a0\u00a0 KW 36 &gt; Concrete tower assembly has been completed.<br \/>3.\u00a0\u00a0 KW 42 &gt; Delivery of blades, generator and nacelle.<br \/>4.\u00a0\u00a0 KW 42 &gt; Delivery &amp; assembly of LR 11000 Hueffermann crane.<br \/>5.\u00a0\u00a0 KW 04 &gt; Wind turbine assembly completed.<br \/>6.\u00a0\u00a0 KW 11 &gt; WTG is online &amp; in operation.<\/p>\n<p><strong>WEA 9<\/strong><br \/>1.\u00a0\u00a0 KW 41 &gt; Delivery of blades, generator and nacelle.<br \/>2.\u00a0\u00a0 KW 50 &gt; Tower, nacelle and rotor blade assembly in progress.<br \/>3.\u00a0\u00a0 KW 51 &gt; Delivery &amp; assembly of LR 11000 Wasel crane.<br \/>4.\u00a0\u00a0 KW 04 &gt; Wind turbine assembly completed.<br \/>5.\u00a0\u00a0 KW 07 &gt; Commissioning operations in progress.<br \/>6. \u00a0 KW 11 &gt; WTG is online &amp; in operation.<\/p>\n<p><strong>WEA 10<\/strong><br \/>1.\u00a0\u00a0 KW 42 &gt; Delivery of blades, generator and nacelle.<br \/>2.\u00a0\u00a0 KW 42 &gt; Relocation &amp; assembly of LR 11000 Hueffermann crane.<br \/>3.\u00a0\u00a0 KW 42 &gt; Final component assembly in progress.<br \/>4. \u00a0 KW 07 &gt; Wind turbine assembly completed.<br \/>5.\u00a0\u00a0 KW 12 &gt; Commissioning operations in progress.<br \/>6. \u00a0 KW 16 &gt; WTG is online &amp; in operation.<\/p>\n<p>&nbsp;<\/p>\n<p>[\/et_pb_text][et_pb_text disabled_on=&#8221;on|on|on&#8221; _builder_version=&#8221;4.16&#8243; text_font=&#8221;frutiger55roman||||||||&#8221; text_font_size=&#8221;16px&#8221; text_line_height=&#8221;2em&#8221; header_font=&#8221;titilliumweb-light||||||||&#8221; max_width=&#8221;550px&#8221; disabled=&#8221;on&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<p>A total of 7 wind turbines of type GE-5.3-158 with a hub height of 161.0 m and a capacity of 5.3 MW each will be built in Albringhausen, city of Bassum.<\/p>\n<p>Current status:<\/p>\n<p>The expansion of the access roads, access radii and crane parking areas was started in the 3rd week of 2020. All works have been completed in the meantime and we would like to thank the company Koldewei Stra\u00dfen- und Tiefbau GmbH &amp; Co.KG from Schwaf\u00f6rden for the good cooperation and the flawless execution of the works.<\/p>\n<p>In the meantime, the company Arning Bauunternehmung GmbH from Steinfurt has also uncovered the foundation pits of WTGs 1-7 and installed a 50 cm thick ballast base layer on the bottom. This work was supervised by the office for engineering geology Dr. L\u00fcbbe from Vechta and carried out to our complete satisfaction.<\/p>\n<p>Current work at the wind farm<br \/>Foundation construction: Max B\u00f6gl Bauservice &amp; Co. KG, 92369 Sengenthal<br \/>Construction supervision: Bauwerk Consulting, 48155 M\u00fcnster, Germany<br \/>Reinforcement inspections: TSS Pr\u00fcfingenieure GbR, 49393 Lohne, Germany<br \/>Surveying: \u00d6BVI Lambers &amp; Ostendorf, 49406 Barnstorf<\/p>\n<p>&nbsp;<\/p>\n<p>WTG 3<br \/>1st week 22 &gt; from 25.05.2020 backfilling &amp; covering foundation<br \/>2nd week 23 &gt; from 02.06.2020 remaining work crane footprint<br \/>3rd week 26 &gt; pre-delivery of tower construction elements<br \/>4th week 27 &gt; from 02.07.2020 Tower construction in progress<br \/>5. week 36 &gt; from 02.09.2020 final construction starts<br \/>6. week 39 &gt; 21.09.2020 Tower construction completed<\/p>\n<p>WTG 4<br \/>1st week 23 &gt; from 02.06.2020 Remaining work on crane footprint<br \/>2nd week 26 &gt; Pre-delivery of tower construction elements<br \/>3rd week 28 &gt; from 14.07.2020 Tower construction Begin<br \/>4th week 29 &gt; From 14.07.2020 Tower construction in progress<br \/>5. week 39 &gt; From 23.09.2020 Final construction starts<br \/>6. week 42 &gt; 14.10.2020 Tower construction completed<\/p>\n<p>WTG 2<br \/>1st week 23 &gt; from 02.06.2020 Backfilling &amp; covering foundation<br \/>2nd week 26 &gt; from 22.06.2020 Remaining work on crane positioning area<br \/>3rd week 30 &gt; from 20.07.2020 Pre-delivery of tower construction elements<br \/>4th week 30 &gt; from 22.07.2020 Tower construction in progress<br \/>5. week 43 &gt; from 19.10.2020 final construction starts<br \/>6. week 45 &gt; from 05.11.2020 Tower construction completed<\/p>\n<p>WTG 1<br \/>1st week 18 &gt; start of foundation construction from 29.04.2020<br \/>2nd week 22 &gt; 25.05.2020 Concreting of foundation<br \/>3rd week 23 &gt; stripping, curing, surface inspection<br \/>4th week 26 &gt; from 22.06.2020 backfilling &amp; covering foundation<br \/>5. week 27 &gt; from 29.06.2020 remaining work crane positioning area<br \/>6. week 31 &gt; from 28.07.2020 tower construction in progress<\/p>\n<p>WTG 7<br \/>1st week 22 &gt; formwork \/ reinforcement work<br \/>2nd week 22 &gt; 29.05.2020 concreting of foundation<br \/>3rd week 26 &gt; from 22.06.2020 backfilling &amp; covering foundation<br \/>4th week 27 &gt; from 29.06.2020 Remaining work on crane positioning area<br \/>5. week 32 &gt; from 04.08.2020 pre-delivery of tower construction elements<br \/>6. week 33 &gt; from 12.08.2020 tower construction in progress<\/p>\n<p>WTG 6<br \/>1st week 22 &gt; reinforcement of lower layer \/ placing of anchor cage<br \/>2nd week 23 &gt; 04.06.2020 concreting foundation<br \/>3rd week 26 &gt; from 22.06.2020 backfilling &amp; covering foundation<br \/>4th week 28 &gt; from 06.07.2020 Remaining work on crane positioning area<br \/>5. week 32 &gt; from 04.08.2020 pre-delivery of tower construction elements<br \/>6. week 34 &gt; from 19.08.2020 tower construction in progress<\/p>\n<p>WTG 5<br \/>1st week 23 &gt; from 01.06.2020 Lower template ring \/ Placement of anchor cage<br \/>2nd week 24 &gt; 09.06.2020 concreting foundation<br \/>3rd week 27 &gt; from 29.06.2020 backfilling &amp; covering foundation<br \/>4th week 28 &gt; from 06.07.2020 Remaining work on crane positioning area<br \/>5. week 32 &gt; from 04.08.2020 pre-delivery of tower construction elements<br \/>6. week 35 &gt; from 27.08.2020 Tower construction in progress<\/p>\n<p>[\/et_pb_text][\/et_pb_column][et_pb_column type=&#8221;1_2&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_cta title=&#8221;More info&#8221; button_text=&#8221;wind farms&#8221; _builder_version=&#8221;4.16&#8243; _module_preset=&#8221;default&#8221; background_color=&#8221;#6C6E70&#8243; global_colors_info=&#8221;{}&#8221;]<\/p>\n<p>Data &amp; photos of our projects can be found <a href=\"\/en\/projects\">here.<\/a><\/p>\n<p>News in the overview you will find under <a href=\"\/en\/news\">news.<\/a><\/p>\n<p>[\/et_pb_cta][et_pb_post_nav in_same_term=&#8221;on&#8221; _builder_version=&#8221;4.16&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_post_nav][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In 2022, a total of 10 Enercon 160 EP5 E3 wind turbines with a hub height of 166.0 m and a capacity of 5.56 MW each will be built in Albringhausen, District of Bassum.<\/p>\n","protected":false},"author":6,"featured_media":16213,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[57,39,49,48,51],"tags":[],"class_list":["post-14511","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-2022-2","category-news-en","category-wind-farm-in-operation","category-wind-farms","category-wind-farm-under-construction"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Wind Farm Albringhausen II - W-Wind<\/title>\n<meta name=\"description\" content=\"In 2022, a total of 10 Enercon 160 EP5 E3 wind turbines with a hub height of 166.0 m and a capacity of 5.56 MW each will be erected in Albringhausen, District of Bassum.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.w-wind.de\/en\/wind-farm-albringhausen-ii\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Wind Farm Albringhausen II - W-Wind\" \/>\n<meta property=\"og:description\" content=\"In 2022, a total of 10 Enercon 160 EP5 E3 wind turbines with a hub height of 166.0 m and a capacity of 5.56 MW each will be erected in Albringhausen, District of Bassum.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.w-wind.de\/en\/wind-farm-albringhausen-ii\" \/>\n<meta property=\"og:site_name\" content=\"W-Wind\" \/>\n<meta property=\"article:published_time\" content=\"2022-03-14T09:25:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-09-08T07:21:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.w-wind.de\/wp-content\/uploads\/2023\/03\/AlbR_03_43a.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t<meta property=\"og:image:height\" content=\"1071\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"A Z\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"A Z\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.w-wind.de\\\/en\\\/wind-farm-albringhausen-ii#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.w-wind.de\\\/en\\\/wind-farm-albringhausen-ii\"},\"author\":{\"name\":\"A Z\",\"@id\":\"https:\\\/\\\/www.w-wind.de\\\/en#\\\/schema\\\/person\\\/60bd5f50d2de1a2864a3986fe32b62fc\"},\"headline\":\"Wind Farm Albringhausen II\",\"datePublished\":\"2022-03-14T09:25:00+00:00\",\"dateModified\":\"2023-09-08T07:21:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.w-wind.de\\\/en\\\/wind-farm-albringhausen-ii\"},\"wordCount\":2155,\"image\":{\"@id\":\"https:\\\/\\\/www.w-wind.de\\\/en\\\/wind-farm-albringhausen-ii#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.w-wind.de\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/AlbR_03_43a.jpg\",\"articleSection\":[\"2022\",\"News\",\"Wind farm in operation\",\"wind farms\",\"wind farm under construction\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.w-wind.de\\\/en\\\/wind-farm-albringhausen-ii\",\"url\":\"https:\\\/\\\/www.w-wind.de\\\/en\\\/wind-farm-albringhausen-ii\",\"name\":\"Wind Farm Albringhausen II - W-Wind\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.w-wind.de\\\/en#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.w-wind.de\\\/en\\\/wind-farm-albringhausen-ii#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.w-wind.de\\\/en\\\/wind-farm-albringhausen-ii#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.w-wind.de\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/AlbR_03_43a.jpg\",\"datePublished\":\"2022-03-14T09:25:00+00:00\",\"dateModified\":\"2023-09-08T07:21:55+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.w-wind.de\\\/en#\\\/schema\\\/person\\\/60bd5f50d2de1a2864a3986fe32b62fc\"},\"description\":\"In 2022, a total of 10 Enercon 160 EP5 E3 wind turbines with a hub height of 166.0 m and a capacity of 5.56 MW each will be erected in Albringhausen, District of Bassum.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.w-wind.de\\\/en\\\/wind-farm-albringhausen-ii#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.w-wind.de\\\/en\\\/wind-farm-albringhausen-ii\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.w-wind.de\\\/en\\\/wind-farm-albringhausen-ii#primaryimage\",\"url\":\"https:\\\/\\\/www.w-wind.de\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/AlbR_03_43a.jpg\",\"contentUrl\":\"https:\\\/\\\/www.w-wind.de\\\/wp-content\\\/uploads\\\/2023\\\/03\\\/AlbR_03_43a.jpg\",\"width\":1500,\"height\":1071},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.w-wind.de\\\/en\\\/wind-farm-albringhausen-ii#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/www.w-wind.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Wind Farm Albringhausen II\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.w-wind.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.w-wind.de\\\/en\",\"name\":\"W-Wind\",\"description\":\"WestWind ENERGY\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.w-wind.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.w-wind.de\\\/en#\\\/schema\\\/person\\\/60bd5f50d2de1a2864a3986fe32b62fc\",\"name\":\"A Z\",\"url\":\"https:\\\/\\\/www.w-wind.de\\\/en\\\/author\\\/andyzumaya\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Wind Farm Albringhausen II - W-Wind","description":"In 2022, a total of 10 Enercon 160 EP5 E3 wind turbines with a hub height of 166.0 m and a capacity of 5.56 MW each will be erected in Albringhausen, District of Bassum.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.w-wind.de\/en\/wind-farm-albringhausen-ii","og_locale":"en_US","og_type":"article","og_title":"Wind Farm Albringhausen II - W-Wind","og_description":"In 2022, a total of 10 Enercon 160 EP5 E3 wind turbines with a hub height of 166.0 m and a capacity of 5.56 MW each will be erected in Albringhausen, District of Bassum.","og_url":"https:\/\/www.w-wind.de\/en\/wind-farm-albringhausen-ii","og_site_name":"W-Wind","article_published_time":"2022-03-14T09:25:00+00:00","article_modified_time":"2023-09-08T07:21:55+00:00","og_image":[{"width":1500,"height":1071,"url":"https:\/\/www.w-wind.de\/wp-content\/uploads\/2023\/03\/AlbR_03_43a.jpg","type":"image\/jpeg"}],"author":"A Z","twitter_card":"summary_large_image","twitter_misc":{"Written by":"A Z","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.w-wind.de\/en\/wind-farm-albringhausen-ii#article","isPartOf":{"@id":"https:\/\/www.w-wind.de\/en\/wind-farm-albringhausen-ii"},"author":{"name":"A Z","@id":"https:\/\/www.w-wind.de\/en#\/schema\/person\/60bd5f50d2de1a2864a3986fe32b62fc"},"headline":"Wind Farm Albringhausen II","datePublished":"2022-03-14T09:25:00+00:00","dateModified":"2023-09-08T07:21:55+00:00","mainEntityOfPage":{"@id":"https:\/\/www.w-wind.de\/en\/wind-farm-albringhausen-ii"},"wordCount":2155,"image":{"@id":"https:\/\/www.w-wind.de\/en\/wind-farm-albringhausen-ii#primaryimage"},"thumbnailUrl":"https:\/\/www.w-wind.de\/wp-content\/uploads\/2023\/03\/AlbR_03_43a.jpg","articleSection":["2022","News","Wind farm in operation","wind farms","wind farm under construction"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.w-wind.de\/en\/wind-farm-albringhausen-ii","url":"https:\/\/www.w-wind.de\/en\/wind-farm-albringhausen-ii","name":"Wind Farm Albringhausen II - W-Wind","isPartOf":{"@id":"https:\/\/www.w-wind.de\/en#website"},"primaryImageOfPage":{"@id":"https:\/\/www.w-wind.de\/en\/wind-farm-albringhausen-ii#primaryimage"},"image":{"@id":"https:\/\/www.w-wind.de\/en\/wind-farm-albringhausen-ii#primaryimage"},"thumbnailUrl":"https:\/\/www.w-wind.de\/wp-content\/uploads\/2023\/03\/AlbR_03_43a.jpg","datePublished":"2022-03-14T09:25:00+00:00","dateModified":"2023-09-08T07:21:55+00:00","author":{"@id":"https:\/\/www.w-wind.de\/en#\/schema\/person\/60bd5f50d2de1a2864a3986fe32b62fc"},"description":"In 2022, a total of 10 Enercon 160 EP5 E3 wind turbines with a hub height of 166.0 m and a capacity of 5.56 MW each will be erected in Albringhausen, District of Bassum.","breadcrumb":{"@id":"https:\/\/www.w-wind.de\/en\/wind-farm-albringhausen-ii#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.w-wind.de\/en\/wind-farm-albringhausen-ii"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.w-wind.de\/en\/wind-farm-albringhausen-ii#primaryimage","url":"https:\/\/www.w-wind.de\/wp-content\/uploads\/2023\/03\/AlbR_03_43a.jpg","contentUrl":"https:\/\/www.w-wind.de\/wp-content\/uploads\/2023\/03\/AlbR_03_43a.jpg","width":1500,"height":1071},{"@type":"BreadcrumbList","@id":"https:\/\/www.w-wind.de\/en\/wind-farm-albringhausen-ii#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/www.w-wind.de\/en"},{"@type":"ListItem","position":2,"name":"Wind Farm Albringhausen II"}]},{"@type":"WebSite","@id":"https:\/\/www.w-wind.de\/en#website","url":"https:\/\/www.w-wind.de\/en","name":"W-Wind","description":"WestWind ENERGY","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.w-wind.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.w-wind.de\/en#\/schema\/person\/60bd5f50d2de1a2864a3986fe32b62fc","name":"A Z","url":"https:\/\/www.w-wind.de\/en\/author\/andyzumaya"}]}},"_links":{"self":[{"href":"https:\/\/www.w-wind.de\/en\/wp-json\/wp\/v2\/posts\/14511","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.w-wind.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.w-wind.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.w-wind.de\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.w-wind.de\/en\/wp-json\/wp\/v2\/comments?post=14511"}],"version-history":[{"count":157,"href":"https:\/\/www.w-wind.de\/en\/wp-json\/wp\/v2\/posts\/14511\/revisions"}],"predecessor-version":[{"id":16639,"href":"https:\/\/www.w-wind.de\/en\/wp-json\/wp\/v2\/posts\/14511\/revisions\/16639"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.w-wind.de\/en\/wp-json\/wp\/v2\/media\/16213"}],"wp:attachment":[{"href":"https:\/\/www.w-wind.de\/en\/wp-json\/wp\/v2\/media?parent=14511"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.w-wind.de\/en\/wp-json\/wp\/v2\/categories?post=14511"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.w-wind.de\/en\/wp-json\/wp\/v2\/tags?post=14511"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}